The following are indicative costs for commercial schemes located in south-east England, current in first quarter 2006.
Infiltration systems
Standard pavings, 150 mm thick sub-base (not SUDS, comparison only)Β£35-40/³Ύ2
Permeable pavings, 250 mm crushed rock sub-base, disposal of spoil on siteΒ£40-45/³Ύ2
Permeable pavings, 350 mm crushed rock sub-base, disposal of spoil off siteΒ£50-55/³Ύ2
Land drainage, perforated pipes in trenches, granular fillΒ£30-45/³Ύ
Soakaways, crushed rock soakaway, cover and cover slab, geotextile membrane and granular surround, excavation and disposal of soil off-siteΒ£150-275/³Ύ3
Swales; excavation and formation of swale channel to fall, 1m wide by 750 mm average deep; geo-textile membrane; vegetationΒ£75-100/³Ύ
Retention systems
Geocellular storage system; 500 mm thick storage blocks, perforated land drains in granular surround; sub-base; impermeable membrane; excavation and disposal of spoil off site (surface costs excluded)Β£100-140/³Ύ2
Vortex control valves
Supply cost of valve and chamber ring onlyΒ£200
Total cost of valve and inspection chamberΒ£2,000-2,700
Control systemsΜύ
Bypass separator, about 7,000-litre capacityΒ£9,000-10,000
Full retention separator, about 7,000-litre capacityΒ£15,000